The Deep Geologic Repository project is a long-term disposal facility for the low- and intermediate-level waste produced at the Bruce, Darlington and Pickering nuclear power generating stations.
More about Deep Geologic Repository >

Point Lepreau nuclear generating station is a 635-MW unit commissioned in 1983 and was the first CANDU-6 to begin commercial operation. The refurbishment project is a CAD$1 billion project, with engineering currently under way and implementation scheduled from April 2008 through October 2009.
More about Point Lepreau Refurbishment Oversight Services >

The Westinghouse AP1000™ pressurized water reactor is an advanced 1100-MWe nuclear power plant. It is a modular design that uses 50 percent fewer valves, 35 percent fewer safety grade pumps, and 80 percent less piping than previous nuclear plants. It also features a passive safety design.
More about Westinghouse AP1000™ Nuclear Plant Program >